From:David Brotherhood <david@paul-gaughan.co.uk>
Sent on:Monday, March 8, 2021 11:01:10 AM
To:Pearce, Sarah <Sarah.Pearce@ambervalley.gov.uk>; Paul Gaughan <paul@paul-gaughan.co.uk>
CC:Kelly <kelly@paul-gaughan.co.uk>
Subject:RE: [OFFICIAL] FW: AVA/2020/1082 - Kirkman Road, Loscoe
Attachments:05 PLANNING - SBP - REV C.pdf (608.74 KB)
  

Hi Sarah,

 

Please find attached a revised drawing adding levels as requested.

 

As per the previous email, we are going procure an RMS, so that we can get a condition-less approval.  Are there any other conditions that would need details submitting? if so let me know so that we can get the items sorted.

 

Kind regards

 

David

 

From: Pearce, Sarah <Sarah.Pearce@ambervalley.gov.uk>
Sent: 05 March 2021 12:37
To: Paul Gaughan <paul@paul-gaughan.co.uk>; David Brotherhood <david@paul-gaughan.co.uk>
Cc: 'Kelly' <kelly@paul-gaughan.co.uk>
Subject: [OFFICIAL] FW: AVA/2020/1082 - Kirkman Road, Loscoe

 

Dear Paul/David,

 

Further to my email below, I note that the finished floor levels are annotated on the amended drawing no. DB/SJM/20/05 Rev B. However, to allow me to condition these I will need finished floor levels/eaves/ridge height of neighbouring dwellings annotated on the plan also. Are you able to add these on please? Alternatively I can recommend a condition requiring finished floor levels to be submitted.

 

Kind regards,

 

Sarah

 

From: Pearce, Sarah
Sent: 05 March 2021 10:39
To: Paul Gaughan <paul@paul-gaughan.co.uk>; David Brotherhood <david@paul-gaughan.co.uk>
Cc: 'Kelly' <kelly@paul-gaughan.co.uk>
Subject: AVA/2020/1082 - Kirkman Road, Loscoe

 

Dear Paul/David,

 

RE: Four dwellings at Kirkman Road, Loscoe – AVA/2020/1083

 

I refer to the above application. I’m preparing a recommendation ready for a decision. I note however the following comments from the Borough Council’s Environmental Health (Contamination) section:

 

Thank you for forwarding on the following reports:

•             Erda Phase II Geo-Environmental Assessment, dated December 2020, ref: EAL.69.20

•             Erda Fuel Tank Validation Sampling Letter Report, dated 19th January 2021, ref: EAL.69.20.Let1

•             Erda Rotary Probe Drilling Investigation for Shallow Unrecorded Mine Workings, dated 20th December 2020, ref: EAL.69.20

The Phase II intrusive investigations were carried out to allow further assessment of the risks identified in the SP Associates Phase I Desk Study, dated September 2017, ref: S1553-1.

Made ground was found across the site and following an appropriate sampling strategy elevated contaminants were found in some near-surface samples.

Gas monitoring was not carried out, but as no other significant ground gas sources were identified, the report considers the risk negligible. No evidence of shallow mine workings was found in the probe drilling, so I am satisfied with this conclusion.

The report recommends that the made ground in garden areas is removed. As the made ground generally is 0.5m deep, and the garden areas are not extensive, this would make sense.

Investigation of the sides and base of the former tank chamber did not find elevated concentrations of TPH.

A remediation method statement should now be prepared which details the excavation of the contaminated made ground, if topsoils are imported, how the suitability will be checked, how remediation will be verified (e.g. waste consignment notes, analysis of the near surface samples after removal) and how verification will be reported. I recommend that this remains a pre-commencement requirement at this stage unless a RMS can be submitted prior to determination. I imagine Erda could probably quickly prepare a suitable RMS if the applicant wants to remove the pre-commencement parts.

Please let me know if you would like me to prepare a suitable condition at this stage, or if the applicant would like to submit a RMS.

 

Are you able to confirm whether you wish to address the comments, or prefer a condition?

 

The Contamination Officer will be back in work on Tuesday 9 March, so if you opt for a condition I’m hopeful we can get a condition drafted early next week, with a decision to be issued a day or two afterwards.

 

In the meantime are you able to confirm your agreement to an extension of time until Friday 12 March please?

 

Kind regards,

Sarah Pearce| Planning Officer

Amber Valley Borough Council
Environmental Services | Town Hall, Ripley, Derbyshire, DE5 3BT
Email: sarah.pearce@ambervalley.gov.uk | Telephone: 01773 841658
www.ambervalley.gov.uk

Making a Difference for Amber Valley

 

This email is private. If you are not the intended recipient, please notify the sender by return, destroying the email without disclosing or relying upon it. We may by law have to disclose this email. We monitor both sent and received emails. The attachments are opened at your own risk.


Virus-free. www.avast.com
05 PLANNING - SBP - REV C.pdf