Hello Carol,
Application to determine if prior approval is required for a proposed change of use from commercial, business and service uses (Use Class E) to dwellinghouses (Use Class C3) under the Town and Country Planning (General Permitted Development)(England) Order 2015, Schedule 2, Part 3, Class MA, as amended
I commented on two similar applications concerning the premises earlier this year:
The current PDR seeks the sub-division of the existing bank to create three residential flats on the ground floor (units 2, 4, 5). The ‘Proposed layouts’ drawing (attached) reflects that of AVA/2026/0090, which was granted on 31.07.2026. It appears that the description on which we were originally consulted (‘Change of use and internal subdivision of the former bank to create a commercial unit and 3 residential flats, and the insertion of 5 new windows’) was subsequently amended to refer to the windows only.
The Order states that, before beginning development under Class MA, the developer must apply to the local planning authority for a determination as to whether the prior approval of the authority will be required as to:
(a) transport impacts of the development, particularly to ensure safe site access;
(b) contamination risks in relation to the building;
(c) flooding risks in relation to the building;
(d) impacts of noise from commercial premises on the intended occupiers of the development;
(e) the impact of the change of use on the character or sustainability of a conservation area;
(f) the provision of adequate natural light in all habitable rooms of the dwelling houses;
(g) the impact on intended occupiers of the development of the introduction of residential use in an area the authority considers to be important for general or heavy industry, waste management, storage and distribution, or a mix of such uses;
(h) where the development involves the loss of services provided by a nursery or health centre, the impact on the local provision of the type of services lost; and
(i) where the development meets the fire risk condition, the fire safety impacts on the intended occupants of the building.
Of the above, sections (b), (d) and (g) are potentially relevant to this team.
(b) Contamination risks in relation to the building
I note that my colleague, David Martschenko (Scientific Officer), does not appear to have been consulted separately on this matter.
(d) Impacts of noise from commercial premises on the intended occupiers of the development
Under the relevant heading, the application form states:
‘Noise impacts will be appropriately managed, as an acoustic engineer will be engaged as part of Building Regulations compliance to design and test the necessary sound insulation measures between units and to ensure adequate protection from any nearby commercial noise sources.’
Whilst I have no major concerns about the proposal in principle, there is a potential for adverse impacts on the living conditions of the proposed residential units due to noise from other dwellings and unrestricted commercial activity in Unit 1. This is particularly significant if future activities are not compatible with all activities in Use Class E. Although the occupants would need to accept a degree of disturbance commensurate with the commercial nature of a town centre location, some activities within Use Class E, i.e. Classes E(b)(d-f), may be incompatible with adjoining residential use.
As recognised in the application form (above), where existing buildings are sub-divided, the internal division must provide reasonable resistance to the transmission of airborne sound via walls, floors and stairs, and to impact sound via floors and stairs, with respect to noise from activities and building services plant both within that building and from any adjoining commercial/domestic buildings. The development should therefore comply with the requirements of ‘Approved Document E: Resistance to the passage of sound’ in Schedule 1 to the Building Regulations 2000 (as amended). Building Regulations may not apply in all cases and compliance with the Regulations may not be sufficient to prevent noise complaints, so specialist acoustic advice on sound transmission/insulation should also be sought. Failure to adequately address this matter at the construction stage could result in future enforcement action in response to complaints and the substantial cost of remedying inadequate sound insulation retrospectively.
(g) The impact, on intended occupiers, of the introduction of residential use in an area the authority considers to be important for general or heavy industry, waste management, storage and distribution, or a mix of such uses
The activities listed above are not applicable at this location.
Regards,
Melanie Goodier | Principal Pollution Officer
Amber Valley Borough Council
Pollution Control | Town Hall, Market Place, Ripley, Derbyshire, DE5 3BT
Email (Direct): melanie.goodier@ambervalley.gov.uk; (Office): env.admin@ambervalley.gov.uk | Telephone (Direct): 01773 841325; (Office): 01773 841335 | www.ambervalley.gov.uk
Making a Difference for Amber Valley
Please note that e-mails larger than 25MB will not be accepted at the above e-mail address.
From: development@ambervalley.gov.uk <development@ambervalley.gov.uk>
Sent: 24 August 2026 18:30
To: Goodier, Melanie <Melanie.Goodier@ambervalley.gov.uk>
Subject: Planning Consultation - PDR/2026/0032
Dear Sir/Madam
Consultee Type: EH Pollution Control (Noise/Nuisance)
Our Ref: PDR/2026/0032
Proposal:
Application to determine if prior approval is required for Sub-division of existing bank to create residential flats.
Development Type:
Notifications
Location:
National Westminster Bank Ltd 1 Chesterfield Road Alfreton Derbyshire DE55 7DT
Applicant:
Mr Dominic Palterman
CND Property Limited 183B Derby Road Ripley Derbyshire DE5 8HX
Agent:
Mr Brett Needham
CND Property Limited 183B Derby Road Ripley Derbyshire DE5 8HX
Case Officer Details:
Name: Carol Grant
Telephone: 01773 84
E Mail: carol.grant@ambervalley.gov.uk
I enclose details of this application and would be pleased to receive any comments you may have within the next 21 days.
The Application should be available to view on our website within the next 24 hours.
There is a comments button that you can click on to make comments regarding an application (please see the link below that will take you directly to this planning application) or alternatively you can send a direct email to development@ambervalley.gov.uk
https://www.ambervalley.gov.uk/planning/development-management/view-a-planning-application/?appnumber=PDR-2026-0032
Please let the case officer know if you cannot reply by then.
Sarah Brooks
Planning Manager