From:Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent on:Monday, October 5, 2026 9:49:36 AM
To:Development <development@ambervalley.gov.uk>
Subject:FW: AVA/2026/0343 - Proposed new industrial unit (B2) at Derby Road, Marehay (Our Ref. 26/10200/PL01)
  

Please could this be att?

Thanks

 

From: Goodier, Melanie <Melanie.Goodier@ambervalley.gov.uk>
Sent: 30 September 2026 17:37
To: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Subject: RE: AVA/2026/0343 - Proposed new industrial unit (B2) at Derby Road, Marehay (Our Ref. 26/10200/PL01)

 

Hello Rebecca,

 

The extent of the proposed working hours (including sensitive night-time/weekend hours), and the preference to work on a 24/7 basis, make the attachment of a condition restricting working hours largely meaningless as a means of safeguarding amenity.  Any negative impacts, particularly from noise, would therefore need to be assessed on a worst-case (24/7) basis and an environmental noise impact assessment would be the only remaining means of assessing noise nuisance and securing appropriate mitigation measures.

 

Whilst I have some concerns about approval based on pre-commencement conditions, the distance from the nearest residential receptors should allow for more effective mitigation measures, although these will need to be sufficiently robust to deal with 24/7 working.  If there is any scope to do so, it would also be advisable to address the current noise issues, as well as compliance with condition 8 (AVA/2015/1201), at the existing site (referred to in my initial response e-mail on 15.09.2026) by moving the offending activities.

 

Recommended conditions


Condition 1 – Noise emissions

Before development commences, the applicant shall conduct an environmental noise assessment to rate and assess sound from all industrial and manufacturing processes; fixed installations comprising mechanical and electrical plant, including externally mounted/ducted plant, machinery or equipment; and from the loading and unloading of goods and materials in accordance with the methodology in British Standard 4142:2014+A1:2019 ‘Methods for rating and assessing industrial and commercial sound’.

All noise-sensitive receptors (NSRs) identified shall be protected from associated noise such that the rating level does not exceed the background sound level (an indication of the specific sound source having a low impact, depending on the context) at any NSR.

Development shall not begin until details of the noise mitigation measures, necessary to comply with the above, have been submitted to, and approved in writing by, the Local Planning Authority.  The development shall be carried out and maintained in accordance with the approved details and completed under the supervision of an acoustic engineer, where necessary.

Should the plans alter from those on which the agreed noise assessment is based, a review of the assessment and proposed mitigation measures shall be submitted to, and approved in writing by, the Local Planning Authority before construction commences.

A further acoustic report verifying compliance with the above noise levels at agreed representative premises shall be submitted to, and approved in writing by, the Local Planning Authority following commissioning, or as otherwise agreed.

 

Condition 2 – Emissions to air

Full details of the measures proposed to deal with any smell, fumes, smoke, soot, ash, dust or grit emitted from the premises shall be submitted to, and approved, in writing by, the Local Planning Authority prior to installation.  The development shall be carried out and maintained in accordance with the approved details

 

Condition 3 – External lighting

No permanent external lighting shall be installed unless full details of its design, location, illuminance levels, orientation and operating times have first been agreed with the Local Planning Authority.  All works shall be fully implemented in accordance with the approved scheme before use commences.

 

Condition 4 – Construction activities

All construction activities shall comply with the following:

  1. a. Operating hours:

No works, or deliveries to and from the site, shall occur other than between 08:00 and 18:00 hours on weekdays and between 08:00 and 13:00 hours on Saturdays.  No works shall take place on Sundays or bank holidays.  Any essential extension to these hours, other than for emergency works, shall be agreed with the Local Planning Authority before work commences.  Activities that do not create noise and disturbance to residents may still take place outside these hours;

  1. b. Noise and vibration:

All activities shall comply with the guidance in British Standard BS 5228-1:2009+A1:2014 ‘Code of practice for noise and vibration control on construction and open sites - Part 1: Noise’ (Section 8 and Annex B) and Part 2: Vibration’ (Section 8).

  1. c. Dust/Particulate emissions:

No visible dust/particulate matter shall be emitted beyond the site boundary.  At such times as the prevention of nuisance is not possible, dust/particulate generating activities shall temporarily cease until such time as dust suppression measures become effective.

Site roads shall be hard-surfaced and regularly cleaned, at least once daily.  Any mechanical road sweepers shall use an adequate filtration system and water supply to minimise the emission of dust/mud off-site: under no circumstances shall a sweeper be operated dry, without an adequate water supply;

  1. d. Waste:

No unwanted materials shall be disposed of on site by burning;

  1. e. Lighting:

Any temporary site lighting shall be positioned on site to minimise light trespass and glare.  Temporary site lighting operating between 22:00 and 07:00 hours the following day shall be agreed with the Local Planning Authority.  No site security cameras shall operate an audible warning alarm.

 

Regards,

Melanie Goodier | Principal Pollution Officer

 

Amber Valley Borough Council
Pollution Control | Town Hall, Market Place, Ripley, Derbyshire, DE5 3BT
Email (Direct): melanie.goodier@ambervalley.gov.uk; (Office): env.admin@ambervalley.gov.uk | Telephone (Direct): 01773 841325; (Office): 01773 841335 | www.ambervalley.gov.uk

Making a Difference for Amber Valley

 

Please note that e-mails larger than 25MB will not be accepted at the above e-mail address.

 

From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 22 September 2026 14:14
To: Goodier, Melanie <Melanie.Goodier@ambervalley.gov.uk>
Subject: FW: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Hi Mel,

Please see below. I’ll pop a formal consult on.

 

Kind regards,

Rebecca

 

From: Ashley White <Ashley.white@nineteen47.co.uk>
Sent: 22 September 2026 14:08
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Hi Rebecca

 

The proposed working hours are: Mon-Thurs 4.30am until 2.00am / Fri-Sun 6am to 6pm. Ideally they would like to be able to operate 24/7.

 

Kind regards

Ashley

 

Ashley White

MRTPI

?????

Principal Planner

07802 444731

0330 818 1947

www.nineteen47.co.uk

Sheffield Office:  6 Pat Midgley Lane | Sheffield | S2 5PN

York Office:  Unit B | Ryedale House | 58-60 Piccadilly | York | YO1 9NX

Midlands Office:  Suite 75 | Pure Offices | Sherwood Business Park | Lake View Drive| Nottingham | NG15 0DT

To view our new digital brochures, please click here

Our Privacy Policy sets out the rights you have in relation to your personal data and is available from our website.

This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. nineteen47 Limited | Unit B, Ryedale House | 58-60 Piccadilly | York | YO1 9NX.  Registered in England Company Number 9875776.

 

From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 16 September 2026 07:57
To: Ashley White <
Ashley.white@nineteen47.co.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Good morning Ashley

 

Please could you advise the operating hours that your client is seeking and I’ll put them to the EHO for consideration.

 

Kind regards,

Rebecca

 

From: Ashley White <Ashley.white@nineteen47.co.uk>
Sent: 15 September 2026 16:26
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Hi Rebecca

 

Thank you for your email.

 

I appreciate the Environmental Health Officer's concerns regarding potential noise impacts arising from the proposed unit. Would the Council be amenable to a pre-commencement condition requiring the submission and approval of a noise impact assessment, together with the implementation of any mitigation measures identified by that assessment?

 

In addition, a condition restricting the operating hours of the unit would provide a further degree of control over the use of the site and help to safeguard the amenity of nearby residents.

 

Given that we are already past the original determination deadline and have only just received these comments, this approach would be preferable to avoid any further delay to determination of the application.

 

I welcome your thoughts on whether this approach would be acceptable.

 

Kind regards

Ashley

 

Ashley White

MRTPI

?????

Principal Planner

07802 444731

0330 818 1947

www.nineteen47.co.uk

Sheffield Office:  6 Pat Midgley Lane | Sheffield | S2 5PN

York Office:  Unit B | Ryedale House | 58-60 Piccadilly | York | YO1 9NX

Midlands Office:  Suite 75 | Pure Offices | Sherwood Business Park | Lake View Drive| Nottingham | NG15 0DT

To view our new digital brochures, please click here

Our Privacy Policy sets out the rights you have in relation to your personal data and is available from our website.

This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. nineteen47 Limited | Unit B, Ryedale House | 58-60 Piccadilly | York | YO1 9NX.  Registered in England Company Number 9875776.

 

From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 15 September 2026 15:48
To: Ashley White <
Ashley.white@nineteen47.co.uk>
Subject: FW: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Good afternoon Ashley,

Comments from EH have just come through, and an environmental noise assessment has been requested – please see below. Once you have had opportunity to discuss with your client, please could you let me know how they wish to proceed?

 

Kind regards,

Rebecca

 

The ‘Design and Access Statement’ states that the application site forms part of a larger site with existing planning consent for ‘3 new industrial units plus Hotel/Conference Centre and Children’s Day Nursery’ (AVA/2005/1385).  This approval includes a number of conditions recommended by this team (8, 12, 13, 14, 15, 16, 17); however, some are now very dated, as is the Site Plan.

 

Paragraph 2 of the ‘Design and Access Statement’ states that Tarpey Harris (to the north-east of the application site) is continuing to grow (predicted to double in the next two years) and the application proposes expansion of the business into a new industrial unit.  The application form describes the Use Class as B2 but also states that the opening hours are ‘not relevant’.  The activities and processes, including plant, ventilation or air conditioning, are described as ‘Manufacturer of wax patterns, ceramic core assembly, tooling, and dynamic profiling for industrial and aero turbine sectors’, but provides no further detail.  The absence of a detailed description of the plant and equipment intended for use, as well as the operating hours, makes it impossible to comment on the likely impact on the living and working conditions of residential and employment occupants in the vicinity. 

 

Tarpey Harris - complaints history

Loud noise from the existing Tarpey Harris operation is currently being investigated (Our Ref. 25/04421/NOISEF).  Following a visit, a previous officer described two types of noise: exhaust noise and a spinning/washing machine-type noise from low-level plant near to the residents’ car park at Denby Bank.  On visiting the factory, they found 4 chimney stacks serving powder-coating ovens with afterburners, dust extraction systems and a chiller.  Working hours were described as weekdays to around 01:00.  Remedial works to enclose the extraction systems were completed in November 2025 and, although reduced, noise was still audible at Denby Bank.  No further complaints were received until June 2026 when low air movement was heard during the night-time, thought to be from the extract systems serving the rooms at the rear of the factory, the unenclosed chiller unit or the stacks.  Acoustic fencing around the boundary was proposed, but the officer was also informed that a new extraction system (including some decommissioning of the existing) and an additional nightshift and weekend working were also to be implemented.  Works to the extraction system appeared to have been completed in August 2026; however, the officer has now left the Council and the investigation remains open.

 

Tarpey Harris - planning history

Although the original building was approved under AVA/2005/1385, the extension to the south-east (AVA/2015/1201 - attached) includes conditions restricting activities to protect the amenities of the occupiers of adjoining properties, based on previous complaints about the neighbouring factory to the west: conditions 5 (outdoor storage), 6 (external plant and machinery), 8 (operating hours restricted to 06:00-22:00 Mondays to Fridays only).

 

Recommendation


In light of the above issues with the proposed occupier’s existing site, and the absence of detailed information regarding proposed operating hours, activities and external plant, the application should not be determined until an environmental noise assessment has been submitted to rate and assess sound from all industrial and manufacturing processes; fixed installations comprising mechanical and electrical plant; and from the loading and unloading of goods and materials, undertaken in accordance with the methodology in British Standard 4142:2014+A1:2019 ‘Methods for rating and assessing industrial and commercial sound’.  All noise-sensitive receptors (NSRs) identified should be protected from the combined level of industrial and commercial noise such that the rating level does not exceed the background sound level (an indication of the specific sound source having a low impact, depending on the context) at any NSR with the application of necessary and appropriate noise mitigation measures.

 

The applicant should be advised to contact this team to agree their proposed measurement and assessment methodology, including the times and duration of measurements, prior to commencing an environmental noise assessment.  Details of acoustic consultants working in the local area can be found at: http://www.association-of-noise-consultants.co.uk/

 

 

From: Godson, Rebecca
Sent: 14 September 2026 16:20
To: 'Ashley White' <
Ashley.white@nineteen47.co.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Received with thanks Ashley,

 

Reconsultation with LLFA has been rearranged. Unfortunately I haven’t yet had responses from LHA or EH, but will chase again today, and whilst I won’t be able to determine in their absence, given that a minimum of three weeks from receipt will be required for Derbyshire Wildlife Trust to provide comments on the amended BNG report I would hope that they will be received by then.

 

Kind regards,
Rebecca

 

From: Ashley White <Ashley.white@nineteen47.co.uk>
Sent: 14 September 2026 11:25
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Hi Rebecca

 

Please find enclosed further drainage details in response to the LLFA comments.

 

Have you received any comments from highways or environmental health yet, and will you be able to determine the application without these?

 

The BNG report is due next week so I will pass that on as soon as I am able to do so.

 

Kind regards

Ashley

 

Ashley White

MRTPI

?????

Principal Planner

07802 444731

0330 818 1947

www.nineteen47.co.uk

Sheffield Office:  6 Pat Midgley Lane | Sheffield | S2 5PN

York Office:  Unit B | Ryedale House | 58-60 Piccadilly | York | YO1 9NX

Midlands Office:  Suite 75 | Pure Offices | Sherwood Business Park | Lake View Drive| Nottingham | NG15 0DT

To view our new digital brochures, please click here

Our Privacy Policy sets out the rights you have in relation to your personal data and is available from our website.

This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. nineteen47 Limited | Unit B, Ryedale House | 58-60 Piccadilly | York | YO1 9NX.  Registered in England Company Number 9875776.

 

From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 20 August 2026 10:33
To: Ashley White <
Ashley.white@nineteen47.co.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Good afternoon Ashley,

 

Please find attached latest response from the LLFA. Once you have had opportunity to discuss with your client, please could you confirm their agreement to these or let me know of any concerns or matters you would prefer to be determined as part of the application currently under consideration rather than future discharge?

 

Kind regards,

 

 

Rebecca Godson |  Planning Officer
Amber Valley
 Borough Council
Operations | Town Hall, Ripley, Derbyshire, DE5 3BT
Email: 
rebecca.godson@ambervalley.gov.uk | Telephone: 01773 841599 
www.ambervalley.gov.uk

Making a Difference for Amber Valley

 

Please note that my working week will be reduced over the summer. As a result, responses may take longer than usual. All emails will be addressed in order of receipt as soon as possible. Thank you for your patience and understanding.

 

 

 

From: Ashley White <Ashley.white@nineteen47.co.uk>
Sent: 12 August 2026 14:39
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Hi Rebecca

 

Please see attached a revised FRA & Drainage Strategy, and comments below in response to the LLFA’s queries. I am not sure whether the FRA was included in the original submission, I can only see the Drainage Strategy on file, so hopefully this report answers all outstanding queries.

 

The applicant has not submitted any detail demonstrating how the proposals comply with the National Standards for Sustainable Drainage Systems (SuDS)’ 2025.

As a statutory consultee for surface water the minimum details required on all major planning applications are as follows:

•                          All major planning applications should be in line with the ‘National Standards for Sustainable Drainage Systems (SuDS)’ 2025. Report updated to current version which references this policy

•                          Major developments should incorporate sustainable drainage systems, which should provide multifunctional benefits wherever possible (as per National Planning Policy Framework 182). A range of sustainable drainage techniques must be considered prior to or in conjunction with the planning layout. Previous report already included assessment of SuDS features, report provides summary of site constraints restricting use of traditional SuDS features.

•                          How the sustainable drainage systems integrate with the open space and green infrastructure should be described and what multifunctional benefits they provide should be stated, as per paragraph 59 of planning practice guidance (Aug 2022). Layout includes minimal open space. Non-compatible with use requirements of the site.

•                          Site plan and impermeable area Appendix A (Site Plan) was already in the report, impermeable areas were already listed in the report in site description and assessment of existing flow rates.

•                          Topographic survey of the site Appendix B (Topo) was already in the report.

•                          Appropriate evidence to support how the site will drain (photographs / maps / a confirmation letter from a water company) STW pre-development enquiry response included in Appendices. Plans provided for drainage design.

•                          Basic calculations of the greenfield/brownfield runoff and discharge rates These were already provided in the previous report, updated to latest layout version.

•                          A quick storage estimate to show the required storage volume of surface water on site and an indication of the likely locations We have done a volumes summary in the report, this was already included previously.

•                          Calculations should include allowances for the current Environment Agency guidance for climate change and urban creep. Climate change allowance as per EA guidance. Urban Creep not applicable to commercial/industrial sites. This is already clarified in the report.

•                          Basic ground investigation (desktop survey as a minimum) We already included a desktop assessment of geological conditions. GI report should have been submitted separately and should be assessed by the LLFA alongside the FRA&DS report, not typical to have this appended as it would make the report document very large.

 

Let me know if you have any queries.

 

Kind regards

Ashley

 

Ashley White

MRTPI

?????

Principal Planner

07802 444731

0330 818 1947

www.nineteen47.co.uk

Sheffield Office:  6 Pat Midgley Lane | Sheffield | S2 5PN

York Office:  Unit B | Ryedale House | 58-60 Piccadilly | York | YO1 9NX

Midlands Office:  Suite 75 | Pure Offices | Sherwood Business Park | Lake View Drive| Nottingham | NG15 0DT

To view our new digital brochures, please click here

Our Privacy Policy sets out the rights you have in relation to your personal data and is available from our website.

This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. nineteen47 Limited | Unit B, Ryedale House | 58-60 Piccadilly | York | YO1 9NX.  Registered in England Company Number 9875776.

 

From: Ashley White
Sent: 07 August 2026 09:20
To: 'Godson, Rebecca' <
rebecca.godson@ambervalley.gov.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Thanks Rebecca, let me know if you hear anything from Highways or EHO in the meantime.

 

Kind regards

Ashley

 

Ashley White

MRTPI

?????

Principal Planner

07802 444731

0330 818 1947

www.nineteen47.co.uk

Sheffield Office:  6 Pat Midgley Lane | Sheffield | S2 5PN

York Office:  Unit B | Ryedale House | 58-60 Piccadilly | York | YO1 9NX

Midlands Office:  Suite 75 | Pure Offices | Sherwood Business Park | Lake View Drive| Nottingham | NG15 0DT

To view our new digital brochures, please click here

Our Privacy Policy sets out the rights you have in relation to your personal data and is available from our website.

This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. nineteen47 Limited | Unit B, Ryedale House | 58-60 Piccadilly | York | YO1 9NX.  Registered in England Company Number 9875776.

 

From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 07 August 2026 08:37
To: Ashley White <
Ashley.white@nineteen47.co.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Thank you Ashley,

 

30 September seems reasonable provided I have the information for reconsultations by end of August.

 

Kind regards,
Rebecca

 

From: Ashley White <Ashley.white@nineteen47.co.uk>
Sent: 05 August 2026 11:48
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Hi Rebecca

 

In terms of the extension of time, can I suggest an initial extension to the end of September?

 

Kind regards

Ashley

 

Ashley White

MRTPI

?????

Principal Planner

07802 444731

0330 818 1947

www.nineteen47.co.uk

Sheffield Office:  6 Pat Midgley Lane | Sheffield | S2 5PN

York Office:  Unit B | Ryedale House | 58-60 Piccadilly | York | YO1 9NX

Midlands Office:  Suite 75 | Pure Offices | Sherwood Business Park | Lake View Drive| Nottingham | NG15 0DT

To view our new digital brochures, please click here

Our Privacy Policy sets out the rights you have in relation to your personal data and is available from our website.

This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. nineteen47 Limited | Unit B, Ryedale House | 58-60 Piccadilly | York | YO1 9NX.  Registered in England Company Number 9875776.

 

From: Ashley White
Sent: 05 August 2026 10:00
To: 'Godson, Rebecca' <
rebecca.godson@ambervalley.gov.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Hi Rebecca

 

Thank you for sending the comments – I have passed this on to the drainage consultant and will get back to you ASAP.

 

Kind regards

Ashley

 

Ashley White

MRTPI

?????

Principal Planner

07802 444731

0330 818 1947

www.nineteen47.co.uk

Sheffield Office:  6 Pat Midgley Lane | Sheffield | S2 5PN

York Office:  Unit B | Ryedale House | 58-60 Piccadilly | York | YO1 9NX

Midlands Office:  Suite 75 | Pure Offices | Sherwood Business Park | Lake View Drive| Nottingham | NG15 0DT

To view our new digital brochures, please click here

Our Privacy Policy sets out the rights you have in relation to your personal data and is available from our website.

This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. nineteen47 Limited | Unit B, Ryedale House | 58-60 Piccadilly | York | YO1 9NX.  Registered in England Company Number 9875776.

 

From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 04 August 2026 16:32
To: Ashley White <
Ashley.white@nineteen47.co.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Good afternoon Ashley,

 

I now have a response from the LLFA, who are recommending an objection until such time that further information is submitted:

 

The applicant has not submitted any detail demonstrating how the proposals comply with the National Standards for Sustainable Drainage Systems (SuDS)’ 2025.

As a statutory consultee for surface water the minimum details required on all major planning applications are as follows:

•                     All major planning applications should be in line with the ‘National Standards for Sustainable Drainage Systems (SuDS)’ 2025.

•                     Major developments should incorporate sustainable drainage systems, which should provide multifunctional benefits wherever possible (as per National Planning Policy Framework 182). A range of sustainable drainage techniques must be considered prior to or in conjunction with the planning layout.

•                     How the sustainable drainage systems integrate with the open space and green infrastructure should be described and what multifunctional benefits they provide should be stated, as per paragraph 59 of planning practice guidance (Aug 2022).

•                     Site plan and impermeable area

•                     Topographic survey of the site

•                     Appropriate evidence to support how the site will drain (photographs / maps / a confirmation letter from a water company)

•                     Basic calculations of the greenfield/brownfield runoff and discharge rates

•                     A quick storage estimate to show the required storage volume of surface water on site and an indication of the likely locations

•                     Calculations should include allowances for the current Environment Agency guidance for climate change and urban creep.

•                     Basic ground investigation (desktop survey as a minimum)

 

These details are required at the early planning stage to demonstrate that the proposed site is able to drain and that due consideration has been given to the space required on site for surface water storage.

Please note the level of detail submitted should be proportionate to the size and scale of the development.

 

I assume your client will wish to provide this information, and I am happy to agree an appropriate timescale for this to be submitted. If that is not the case, please let me know.

 

Kind regards,

Rebecca

 

From: Ashley White <Ashley.white@nineteen47.co.uk>
Sent: 30 July 2026 15:04
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Hi Rebecca

 

Thank you for your email confirming those queries.

 

Once we understand timescales for the additional reports to be produced I can provide an update.

 

Let me know if you receive any of the outstanding responses.

 

Kind regards

Ashley

 

Ashley White

MRTPI

?????

Principal Planner

07802 444731

0330 818 1947

www.nineteen47.co.uk

Sheffield Office:  6 Pat Midgley Lane | Sheffield | S2 5PN

York Office:  Unit B | Ryedale House | 58-60 Piccadilly | York | YO1 9NX

Midlands Office:  Suite 75 | Pure Offices | Sherwood Business Park | Lake View Drive| Nottingham | NG15 0DT

To view our new digital brochures, please click here

Our Privacy Policy sets out the rights you have in relation to your personal data and is available from our website.

This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. nineteen47 Limited | Unit B, Ryedale House | 58-60 Piccadilly | York | YO1 9NX.  Registered in England Company Number 9875776.

 

From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 30 July 2026 14:52
To: Ashley White <
Ashley.white@nineteen47.co.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

You don't often get email from rebecca.godson@ambervalley.gov.uk. Learn why this is important

Thank you for your quick response, Ashley.

 

Amber Valley Borough Council does not employ an ecology officer, and instead commissions advice from Derbyshire Wildlife Trust.

 

Drawing SP01F which clarified the RPAs was accepted by the Trees and Conservation Officer, and the proposal is now acceptable from their perspective subject to conditioning of barriers that meet the specification set out in BS5837:2012 being installed where shown on the attached plan prior to commencement of work and remain for the duration of the development.

Both LLFA and Environmental Health (Pollution) comments are outstanding and I’m aware that unfortunately there are currently delays to receiving these. I’m also still waiting to hear back from Highways in relation to Simon’s response to their queries and have followed that up today.

 

Ideally, we’ll avoid an extension of time, but I’m certainly open to that in terms of matters being addressed to achieve a positive outcome.

 

If anything else arises, I’ll be in touch.

 

Kind regards,

Rebecca

 

From: Ashley White <Ashley.white@nineteen47.co.uk>
Sent: 28 July 2026 10:53
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Hi Rebecca

 

Thank you for your email and for sending the Coal Authority comments which I will review and respond accordingly.

 

We are in the process of appointing an Ecologist to address the BNG comments from DWT. Are you also anticipating a response from your ecology officer?

 

We are also in the process of appointing a sustainability consultant to produce the required Climate Change assessment.

 

Can you confirm that all previous queries relating to trees are now resolved?

 

I understand that Simon provided some comments in relation to parking number in response to queries raised by highways, are you waiting for further comments back from highways or is this now resolved?

 

Have you received, or are you expecting, comments from the following consultees:


-  LLFA
- EHO (Noise)

 

I think that covers all outstanding matters on this application but please let me know if I have missed anything.

 

I note the determination deadline of 1st September; would you be amenable to agreeing an extension of time should additional time be required to resolve the above matters?

 

Please use my Sheffield office address below.

 

Kind regards

Ashley

 

Ashley White

MRTPI

?????

Principal Planner

07802 444731

0330 818 1947

www.nineteen47.co.uk

Sheffield Office:  6 Pat Midgley Lane | Sheffield | S2 5PN

York Office:  Unit B | Ryedale House | 58-60 Piccadilly | York | YO1 9NX

Midlands Office:  Suite 75 | Pure Offices | Sherwood Business Park | Lake View Drive| Nottingham | NG15 0DT

To view our new digital brochures, please click here

Our Privacy Policy sets out the rights you have in relation to your personal data and is available from our website.

This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. The sender therefore does not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmission. If verification is required please request a hard-copy version. nineteen47 Limited | Unit B, Ryedale House | 58-60 Piccadilly | York | YO1 9NX.  Registered in England Company Number 9875776.

 

From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 28 July 2026 09:56
To: Ashley White <
Ashley.white@nineteen47.co.uk>
Subject: FW: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

You don't often get email from rebecca.godson@ambervalley.gov.uk. Learn why this is important

Good morning Ashley,

 

Please see attached reconsultation response from The Coal Authority, which will require further information if their objection is to be withdrawn. The requested BNG information is also outstanding (see below).

 

Could you please also provide a postal address for our records?

 

Kind regards,

 

 

Rebecca Godson |  Planning Officer
Amber Valley
 Borough Council
Operations | Town Hall, Ripley, Derbyshire, DE5 3BT
Email: 
rebecca.godson@ambervalley.gov.uk | Telephone: 01773 841599 
www.ambervalley.gov.uk

Making a Difference for Amber Valley

 

Please note that my working week will be reduced over the summer. As a result, responses may take longer than usual. All emails will be addressed in order of receipt as soon as possible. Thank you for your patience and understanding.

 

 

 

From: Simon Petrie <highlanedesign@hotmail.com>
Sent: 27 July 2026 11:17
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Cc: Ashley White <
ashley.white@nineteen47.co.uk>
Subject: Re: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Dear Rebecca

 

My client's planning consultant nineteen47 are taking over as agents and will be providing all outstanding information.

 

The person dealing with this will now be Ashley White and I have copied him in with this email.

 

Kind regards

 

Simon Petrie

 

Simon Petrie - 07816513918


From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 23 July 2026 12:47
To: Simon Petrie <
highlanedesign@hotmail.com>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Thank you for your email Simon,

 

It would appear that the site was used by STW as a temporary compound in accordance with their permitted development rights, which are exempt from BNG.

 

Therefore the request still stands as it is not considered that the baseline prior to this could be ignored because solely because it was cleared by a statutory undertaker.

 

I look forward to hearing from you.

 

Kind regards,

Rebecca

 

From: Simon Petrie <highlanedesign@hotmail.com>
Sent: 22 July 2026 12:08
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Cc: Roger Hartshorn <
rlh@garnerholdings.co.uk>; Ashley White <ashley.white@nineteen47.co.uk>
Subject: Re: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Dear Rebecca

 

Thank you for the above comments.

 

I cannot quite understand as the site was originally granted approval following remediation by the Coal Authority in 2007 when it was stoned up ready for development.

 

Obviously much time has passed since then.

 

The attached image is recently form when Severn Trent were using this as a compound which shows it stripped and with hard servicing.

 

Did they apply for permission for this and for stripping the site as the attached photograph shows pretty well what exists now.

 

Please call if you wish to discuss.

 

Kind regards

 

Simon Petrie

 

Simon Petrie - 07816513918


From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 21 July 2026 10:05
To: Simon Petrie <
highlanedesign@hotmail.com>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Good morning Simon,

 

The Trees and Conservation Officer has confirmed they are happy with the drawing and the proposal to be acceptable from their perspective subject to conditioning of works being carried out in accordance with the arboricultural report.

 

The CMRA and ground investigations have been forwarded to the Coal Authority, and I await their response.

 

However, I now have comments back from Derbyshire Wildlife Trust, our ecology and biodiversity consultee, who consider that due to timing of the site clearance, mandatory BNG will apply – please see attached. Please could you arrange the required retrospective pre-clearance assessment, and submission of the BNG metric for reconsultation?

 

Kind regards,

Rebecca

 

From: Simon Petrie <highlanedesign@hotmail.com>
Sent: 16 July 2026 14:24
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Cc: Don Berry <
dblindendesign@msn.com>; John Booth <info@jabooth.co.uk>
Subject: Re: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Dear Rebecca

 

Thank you for your email with comments from your tree officer.

 

Although all the trees are outside of the site boundary, we commissioned and Arboricultural Report to assess any effects on the trees outside the boundary between the site and the road.

 

This is the report submitted and is still accurate.

 

On reviewing this report we decided to move the building away from the boundary so as no works are being carried out within the tree RPAs as shown on SP01 submitted ( the dotted blue circles on this drawings are the tree RPAs taken from the report ).

 

Please find attached SP01F revised to clarify the RPAs and the Protective fencing and also a 'north point'. This plan is to a scale of 1:250 @ A1.

 

I hope that this is satisfactory but if you have any further queries or comments then please do not hesitate to contact me.

 

Kind regards

 

Simon Petrie

 

 

Simon Petrie - 07816513918


From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 15 July 2026 12:59
To: Simon Petrie <
highlanedesign@hotmail.com>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Received with thanks Simon,

 

I also now have comments from the Trees and Conservation Officer (italicised below) who has requested updated arboricultural information to be submitted, as per their comments, to allow them to properly comment on the application.

 

Kind regards,
Rebecca

 

The majority of the site is clear from vegetation but there are trees to the Southeast of the site between the proposal and the road. The tree survey plan within the report does not meet the requirements of a BS5837:2012 plan, or BS5837:2012 Tree Protection Plan as it is not to scale and does not properly illustrate crown spreads or root protection areas.

 

For clarity, BS5837:2012 states the following:

 

The survey plan also appears to show a layout plan for the site different from that submitted in drawing SP01.  Drawing SP01 shows dotted lines around trees but it is unclear what these relate to.

 

The arboricultural report also contains tree protection and arboricultural method statement information that is largely generic and any specific requirement for the site should clearly be shown, as per the above recommendations from BS5837:2012.

 

 

 

 

From: Simon Petrie <highlanedesign@hotmail.com>
Sent: 14 July 2026 17:39
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Cc: Roger Hartshorn <
rlh@garnerholdings.co.uk>; Don Berry <dblindendesign@msn.com>
Subject: Re: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Dear Rebecca

 

Please find attached PDF of SP02C revised to incorporate the requirements of point 1.

 

The building has been design to incorporate the requirements of EN1 and our planning consultant is preparing the Climate Change Assessment to demonstrate this.

 

Attached is a PDF of P03D revised to incorporate all the proposed materials and colours as requested.

 

If you require anything further then please do not hesitate to contact me.

 

Kind regards

 

Simon Petrie

 

Simon Petrie - 07816513918


From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 13 July 2026 09:41
To: Simon Petrie <
highlanedesign@hotmail.com>
Subject: FW: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Good morning Simon,

 

Further to my email of last week, please could you also address the following?

 

  1. 1. Although the mandatory BNG exemption form has been submitted, Local Plan policy EN8 requires all development to deliver measurable and proportionate biodiversity net gains regardless of any BNG exemption. Accordingly, pre-commencement conditions are avoided for this, and the easiest way would be for species enhancement measures to be added to the drawings now for consideration by Derbyshire Wildlife Trust.
  2. 2. Please could you also provide a Climate Change Assessment that demonstrates how climate change issues have been considered in accordance with Local Plan policy EN1.
  3. 3. Could the materials, as set out in the application form, be annotated on the elevations drawing (P03) for conditioning purposes?

 

Kind regards,

Rebecca

 

 

From: Godson, Rebecca
Sent: 09 July 2026 15:34
To: 'Simon Petrie' <
highlanedesign@hotmail.com>
Subject: RE: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Good afternoon Simon,

 

Highways are preparing formal comments, but in the meantime have asked me to check with you the following:

 

“It states that the development could generate upto 150 more jobs so am I to assume that this new unit will solely house these new staff and not contain any existing staff from the nearby site, or are we considering that some existing staff may transfer over and then the site also has potential to increase staff by 150?

 

In terms of parking, even if we just consider 150 new staff within the unit spread over 4 shifts, this equates to 37/38 staff per shift. What happens at shift handover? This would require approx. 75-80 spaces as vehicles will be arriving prior to shift.  I still have some concerns knowing the potential staff numbers that the parking is insufficient.”

 

I look forward to hearing from you.

 

Kind regards,
Rebecca

 

From: Simon Petrie <highlanedesign@hotmail.com>
Sent: 22 June 2026 16:35
To: Godson, Rebecca <
rebecca.godson@ambervalley.gov.uk>
Cc: Roger Hartshorn <
rlh@garnerholdings.co.uk>
Subject: Re: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Dear Rebecca

 

The previous required parking provision for B2 in an edge of town location was 1 space per 90m2 which would have been 25 spaces.

 

Our client predicts that the development may generate up to 150 more jobs however these would be split over four shifts so considers the provision of 60 spaces together with the motorcycle and cycle spaces adequate for their needs.

 

With regard to the comments by the Coal Authority our specialist is in the process of preparing a site specific ground investigation and CMRA.

 

Kind regards

 

Simon Petrie

 

Simon Petrie - 07816513918


From: Godson, Rebecca <rebecca.godson@ambervalley.gov.uk>
Sent: 19 June 2026 14:59
To: Simon Petrie <
highlanedesign@hotmail.com>
Subject: [OFFICIAL] FW: AVA/2026/0343 - Proposed new industrial unit

 

Good afternoon Simon,

 

Please see attached consultee response from the Local Highways Authority, which requests justification of parking provision.

 

Kind regards,

Rebecca

 

From: Godson, Rebecca
Sent: 17 June 2026 16:08
To: 'highlanedesign@hotmail.com' <
highlanedesign@hotmail.com>
Subject: AVA/2026/0343 - Proposed new industrial unit

 

Good afternoon Simon,

 

Please see attached consultee response from The Coal Authority which requires submission of a site and development specific CMRA.

 

Kind regards,

 

 

Rebecca Godson |  Planning Officer
Amber Valley
 Borough Council
Operations | Town Hall, Ripley, Derbyshire, DE5 3BT
Email: 
rebecca.godson@ambervalley.gov.uk | Telephone: 01773 841599 
www.ambervalley.gov.uk

Making a Difference for Amber Valley

 

Please note that my working week will be reduced over the summer. As a result, responses may take longer than usual. All emails will be addressed in order of receipt as soon as possible. Thank you for your patience and understanding.

 

This email is private. If you are not the intended recipient, please notify the sender by return, destroying the email without disclosing or relying upon it. We may by law have to disclose this email. We monitor both sent and received emails. The attachments are opened at your own risk.

image001.png

image002.png

image003.png

image004.png

image005.png

image006.png

image007.png

image008.jpg

image009.png

image010.jpg

image011.png